Case Studies - 500PLUS® PREFAB - Commercial Construction Solutions - OneSteel Reinforcing

Case Studies

500PLUS® PREFAB – Overview Video

500PLUS® PREFAB takes the steelfixing of major structural components such as piles, ground beams, pad footings, columns, beam arches and lattice girders off the critical path. Prefabrication also speeds construction and reduces costs on all types of projects.

 



500PLUS® PREFAB – Residential Towers NSW

Residential Towers is a seven storey building in Hurstville, Sydney comprising of residential apartments and office suites. It's the first construction project Kayrouz Constructions have used prefab columns. The 52 500PLUS® PREFAB columns required per floor were craned into place in a single day which reduced steelfixing labour by 60 per cent.

 



500PLUS® PREFAB – 126 Mid City Centre, 420 George Street NSW

Incorporating 500PLUS® PREFAB beams hepled mulit-national construction company Bovis Lend Lease save on labour and took steelfixing off the critical path when building the 30 storey Mid City Centre at 420 George Street Sydney.

 



500PLUS® PREFAB Ground Works Solutions - Piling

500PLUS® PREFAB cages for bored and precast pier applications. Customised and special purpose cages are also available, with special accessories including spacers and reosox completing the package. 500PLUS® PREFAB piles are delivered to site to your construction schedule.

 



500PLUS® PREFAB – Eureka Towers VIC

Eureka Tower is a 88-storey residential building in Southgate, Melbourne that required hundreds of 500PLUS® PREFAB reinforcing cages for pier cages, pad footings and double storey columns. This provided Grocon with cost and time savings across many aspects of the concrete design and construction.

 



500PLUS® PREFAB Ground Works Solutions - Sheet Piling

500PLUS® PREFAB Sheet Piles with 500PLUS® REIDBAR Soil Anchors.

 



500PLUS® PREFAB Ground Works Solutions - Footings

500PLUS® PREFAB and Cut & Bent Mesh solutions including Trench Mesh, Footing Cages, Pad Footings and Pile Caps.

 



500PLUS® PREFAB – 126 Phillip Street NSW

The 40 storey office tower at 126 Phillip Street, Sydney incorporated a number of advanced construction techniques. The extensive use of prefabricated reinforcing, custom-designed quick release table forms and a very high strength concrete were used, which consistently achieved four day construction cycles on the tower’s 1400m2 typical floors.

 



500PLUS® PREFAB – Innovation Place NSW

Innovation Place at 100 Arthur Street, North Sydney is a 23 storey building that required 100s of prefabricated reinforcing cages for the columns. They were delivered on site when required to help Bovis Lend Lease achieve a target of a one floor per week construction cycle which helped save a day per floor.

 



500PLUS® PREFAB – Precinct C, Canberra ACT

Precinct C comprises two 10 storey commercial office towers for the Australian Taxation Office in Canberra. A unique feature of the structural design for the project is the inclusion of “Y” shaped columns requiring 72 prefabricated reinforcing cages for the arms for the 36 “Y” columns across the two buildings.

 



500PLUS® PREFAB – Kwinana Railway WA

The Kwinana Railway extension Project required 600 prefabricated, 11m long x 2m wide curved reinforcing cages for precast concrete to construct the four railway underpasses. The remote location, high cost of delivery and the potential for delays in steelfixing convinced the builder to opt for prefabricated pile cages for its remedial piling works.

 



500PLUS® PREFAB – Pedestrian Footbridge MCG VIC

When Leighton Contactors needed to find a quicker way of placing the reinforcing steel during the construction of the MCG footbridge over the rail and tram lines between the multi-purpose arena and the MCG in Melbourne, OneSteel Reinforcing was commissioned to schedule and prefabricate all the foundation and abutment reinforcement cages for the project.